How is the production of no-burn cutting brick machine blocks
2021-10-28
The production process of free burned block brick production process is introduced, today we introduce the production process and process of block brick products processed by free burned brick machine.
1. material allocation: the ingredients of various raw materials are mainly determined by the strength level of small blocks, and the strength of small blocks is also related to the hollow rate of small blocks. After the ratio is determined, the measurement of various raw materials are measured by weight. Whether the measurement is accurate will directly affect the workability of the mix, thus affecting the performance of small blocks. In particular, the moisture content of sand and stone should be tested frequently to ensure the accuracy of the mix.
2. Concrete mixing: mixing according to sand, cement, stone in order to feed, dry mix and then add water to mix. If the admixture is added, it can be added after wet mixing with water. Divided into dry and wet mix, the purpose is to mix the mixture fully uniform. Uneven mixing will reduce the compatibility of the mixture and the strength of small blocks. Mixing time is too long will affect the productivity of the mixer. Concrete mixer should be used forced mixer, the concrete mix collapse degree control for 0, but molding the block surface should be slightly wet and dense.
3. molding: concrete small hollow block molding should be used to vibrate and pressurize the block machine equipment. China's production of block machine after continuous improvement and improvement has been able to produce high-quality concrete small hollow blocks.
4. maintenance: generally use natural maintenance, daily watering more than 3 times, should keep the product for wet state, continuous watering about 7 days, natural maintenance 28 days can be factory. Can also use steam maintenance, so as to shorten the maintenance time, the product can be shipped early.
5. Finished product stacking and inspection: small blocks should be divided into specifications and grade stacking, stacking on the mark, stacking site must be flat, stacking height should not exceed 1.6m, between the stack to maintain a proper channel, there should be rain and drainage measures.